DHL

We were approached by our Client to propose a suitable solution to retain a 7m high slope to the highway boundary of their site provide space for the construction of a new distribution hub.
The design proposed and provided for the new slope included soil nails and structural mesh with a mini gabion facing all the materials and methods employed had to satisfy the requirements for highways works.
A high voltage cable was located parallel to the site boundary and discussions were held with the relevant authorities and Client to establish an acceptable solution to provide support in the upper section of the slope. Due to the restricted space and concerns of the relevant service authorities with respect to works in the proximity of the cable driven anchors were used in the upper section of the wall and stringent procedures put in place to ensure the integrity of the cable and safety of all operatives was maintained.

  • Descripton
  • Specification

We were approached by our Client to propose a suitable solution to retain a 7m high slope to the highway boundary of their site provide space for the construction of a new distribution hub.
The design proposed and provided for the new slope included soil nails and structural mesh with a mini gabion facing all the materials and methods employed had to satisfy the requirements for highways works.
A high voltage cable was located parallel to the site boundary and discussions were held with the relevant authorities and Client to establish an acceptable solution to provide support in the upper section of the slope. Due to the restricted space and concerns of the relevant service authorities with respect to works in the proximity of the cable driven anchors were used in the upper section of the wall and stringent procedures put in place to ensure the integrity of the cable and safety of all operatives was maintained.
Prior to the excavation of the new slope no water issues had been encountered on the site and the ground investigation did not indicate the presence of water. As the slope was excavated the presence of old clay land drains was reported, however it was only once the anchor installation works commenced on site that water issued became apparent throughout the upper 2 m of the slope resulting in localised surface failures. These were stabilised with the installation of additional nails and structural mesh to retain the slope and concrete to rebuild the face.
Bespoke caps were designed and made to intercept water flow from the existing land drains and pipes were connected to these caps and run to the toe of the slope, within the gabion facing, to be connected to the main site drainage by the main contractor. A series of adit drains were also installed within the face and piped to the toe of the slope to outlet into a toe drain installed by the main contractor, to address any potential water issues.
Despite the issues encountered on site we were able to work with the main contractor to ensure that our works were completed in a timely manner and did not adversely affect their programme.

Project:

Formation of a new 7m high retained slope to the highway boundary to the site of a new DHL Distribution Centre

Location:

Milton Keynes

Contract Duration:

6 Weeks

Area Treated:

1100m2

Anchors Installed:

104 Anchors and 600 soil nails

Equipment:

Klemm 805 drilling rig